Topic Archives: Projects

Support Tally Ho

Sep 22, 2019, 11:36 AM
After the busyness of the Frame-raising, it’s just Leo and the boat again for a while. He had some tough decisions to make as he looked into ordering the timber for the deck-structure and planks. After a slow week of theorizing and office work, he finally gets back onto the tools, and marks the position of the Rabbet and starts cutting the shape of the cutwater into the stem.
Sep 7, 2019, 5:27 PM
Tally Ho is fully re-framed! In this episode we see the final part of the frame-raising party, as we make and install the last of the frames that make up the bow of the boat. We also work on the Fashion Pieces, and take some time to do some local sailing. Finally, a container-full of really long timber arrives from Suriname, and we have to figure out the logistics of moving it around.