The Blog

Support Tally Ho

 

Aug 22, 2020, 7:29 PM
In this episode Leo starts thinking about the plank fastenings for Tally Ho. Using copper rivets is the strongest and most authentic choice, but they are not available to buy in the size I need. Just as I am trying to work out the smartest way to make the rivets, we receive a mysterious box in the mail, from a fan. Amazingly, someone has custom-fabricated a machine for making copper rivets out of round bar! We also work on making all the patterns for the hanging knees, which will be cast in Bronze at PT Foundry. Matt and David join the team, and get stuck into grinding bronze, and Rosie gets into her stride laminating the patterns. Backtrack is unamused by the baby chicks.
Aug 8, 2020, 10:28 PM
In this episode we calculate the locations and sizes of all the hull planks, based on the complex shape of the hull. I’ve never done this before, so we get some help from the Lead Shipwright on the Western Flyer Project (Shipwrights Co-Op, PT). I’m also very excited to welcome two new members to the team - Rosie, who is going to be in an apprentice-style role, and Charlie, who is going to be helping out with video production! We also continue working on the floors, fairing the frames, and making long battens for the lining-out. Meanwhile Backtrack finds a new favourite napping spot and Pancho steps up her dancing game.