Leo finishes twisting the beam shelves into place, bending them into their final positions forward and aft. He receives the repaired part of the pipe threading machine in the mail back from Keith Rucker, who brazed together the broken pieces and replaced the bushings. After reassembling the threading machine, it works wonderfully.


Finally, Leo needs to work out an efficient way to fabricate bolts to fasten the beam shelves to the frames, and so he makes a few haphazard jibs to help. Pancho takes a bath, and Leo find another Shipwright to work on the project with him!

 

 

To become a Patron - https://www.patreon.com/sampsonboatco

To donate or support - http://sampsonboat.co.uk/support/

Keith Rucker’s videos on repairing the Threading Machine part:

https://youtu.be/C5HKiKcoONc     https://youtu.be/Bro96kR42lM

Music:

  • Dan Lebowitz - Torrance Sunset
  • Otis McDonald - Behind Closed Doors
  • Arkansas Traveler
  • Play Song