The Blog

Support Tally Ho

 

Jan 19, 2020, 9:35 AM
As Leo's away from the boat for a while, this is a Q&A episode! Will TALLY HO sail with a GPS? Where will her first (post-rebuild) voyage be? Will Leo be building a replica of the original tender? Could a dolphin, if properly trained, operate his forklift?! For answers to these THRILLING questions, and more, join Leo for a cup of tea and a chat in episode 64.
Jun 10, 2019, 7:03 PM
After a holiday on a beautiful yacht in Turkey, Cecca and Leo head back to the US, where Tally Ho is waiting. Leo gets two new volunteers, Joe and Jack, who start off by making Frame Templates for the bow. In preparation for the new Bow Assembly, we cut the old Frame Heels and Hood End Fastenings, spring out the planks and frames in the bow, and remove the old Stem and Forefoot.
Apr 7, 2019, 10:35 PM
EPISODE 46. After weeks of hectic preparation, we begin the big push to re-frame the stern of Tally Ho! For these 3 weeks, we have 10 people (including myself) working full-time on the boat: Kirt (USA), Finn (UK), Arnaud (Belgium), Thom (UK), Pat (USA), Max (USA), Robert (UK), Glenda & Bill (USA). After a few days spent training all the new members of the team, we get into full-swing frame production, and are able to achieve our goal of getting one pair of frames made and bedded per day! There is a great sense of camaraderie in the yard, and after making 7 frames we celebrate our progress by taking our little gaff-rigged dinghy out for a lazy Sunday sail.
Oct 1, 2017, 1:15 PM
"In this video; I have to take off to Maine for some sailing work aboard the mighty Three-masted Schooner Adix, and then furnish and move into the workshop loft when I get back. I also make a lofting table for the Tally Ho drawings, in a thinly disguised attempt to put off all the real work waiting for me outside."