Episode 120 - Fitting the Lead Ballast Keel
Feb 26, 2022 5lkxzxHaving cast the 17,000lb Lead Ballast Keel, we finally break it out of the mould and take a proper look at it! After trimming the ends and cutting a key with a chainsaw, we have to figure out a way of moving it around, in order to get it underneath the boat.
To become a Patron - https://www.patreon.com/sampsonboatco
To donate or support - http://sampsonboat.co.uk/support
Music:
- Yard Sale - Silent Partner
- Hold on a Second - John Deley and the 41 Players
- Minor Mush - John Deley and the 41 Players
- Biggie - ALBIS
- Hear the Noise - John Deley and the 41 Players
Loading Conversation