In this episode we finish planking the bulwarks - but before the last planks can be fastened, the stanchions themselves have to each be cut down to their final length and have a tenon cut into the top.

Meanwhile, Patrick makes a beautiful oak post inside the boat, as well as a bulkhead that divides the galley and the chart table.

The winter weather bring snow and flooding, causing disruption in the boatyard but creating some beautiful scenery.


To become a Patron - https://www.patreon.com/sampsonboatco

To donate or support - http://sampsonboat.co.uk/support

Music:

  • Runaways - Silent Partner
  • Empty Bottle, Empty Bed - Mini Vandals
  • RESPECOGNIZE - Diamond Ortiz
  • Lonesome Star - Unicorn Heads
  • Gypsy Stroll - Aaron Lieberman
  • Get 'er Done - Aaron Lieberman
  • Walk the Dog - Coyote Hearing
  • Celebration - Otis McDonald